Documentation

get_assessment_history

Get assessment history

The production assessment contract contains three explicitly labeled stages: tax year 2025 prior, tax year 2026 current, and tax year 2027 proposed.

Start free

When to use it

Use for the current official assessment sequence: tax year 2025 prior, tax year 2026 current, and tax year 2027 proposed. These stages are distinct, and assessed value is not an appraisal or lending value.

Use when stage-specific assessed land, improvement, or total values matter. Preserve the stage and source date with every displayed value.

Input contract

These inputs and limits are pinned to the production v0.4.10 server contract. Omitted optional values use the documented defaults.

Input contract table
InputContract
ssloptional; string; min length 1; max length 32
addressoptional; string; min length 2; max length 160
{
  "ssl": "0107--0075"
}

Response and verification

Successful sourced responses preserve effective dates, typed null meaning, source references, quality flags, and exact-versus-contextual property-link scope.

Use the display-ready sources for a visible Source or Verify action. Responses return each field with a source reference that can be checked against the official portal. See Source citations and verification for the evidence format.

Limits

  • This is a three-stage current sequence, not a long historical series.
  • A proposed assessment is not final.
  • Assessed value is not market value, an appraisal, or lending value.